One calculator for common outdoor materials. The measured quantity, planning allowance, supplier conversion, and rounded order stay visible.

Tool entries stay here unless you choose to share or submit them.
Where to measure the work areaLengthWidthAdded depth measured in inches

Split an irregular area into non-overlapping rectangles. Enter the depth being added. Required depth and base preparation need separate assessment.

Example measurements — starting values demonstrate the calculator. Replace every measurement that differs from your property.

Measure

Project area

Gravel / crusher run
ft
ft
in

Enter the depth being added, not material already present.

Repeated areas and example depths — optional
areas

Use the additional-sections control below for different lengths, widths or depths.

This changes only the starter depth. The depth remains editable and is not design advice.

Add different-size sections

Keep areas separate and avoid counting an overlap twice. Depth is ignored for sod and pine-straw coverage.

Add supplier pricing — optional
$/ton
$

Leave price at zero for quantities only. A zero entry means the price is unknown.

Adjust allowance, density and coverage
%
×

Leave at 1 for depth before compaction. If you enter a finished compacted depth instead, use the supplier’s confirmed loose-volume factor.

tons/yd³

Editable starter value only. Replace it with the supplier's conversion for the exact material.

View current result

Example estimate — measurements not confirmed

Gravel / crusher run

Current editable assumptions: 10% planning allowance; 1× loose-volume factor; 1.5 tons per loose cubic yard. Change these under Adjust allowance, density and coverage when supplier or field information is available.

Both gravel tools start with 10% allowance and 1.5 US tons per loose cubic yard. This tool rounds an order up to 0.25 yd³, then 0.5 ton; the driveway tool shows unrounded quantities. Use the same depth, density and allowance to compare. Neither supplies a required construction depth.

Area

720 sq ft

Measured volume

8.89 yd³

4 in entered depth

Planning order

10 yd³

Includes 10% allowance × 1 loose factor; rounded to 0.25 yd³

Estimated order weight

15 tons

Using 1.5 tons per loose yd³

Review packet

Copy, print, and share run only when you choose them. Sharing sends this summary to the app or person you select.

Compare two planning options

Set the calculator for the first option and save A. Change the inputs, then save B. These snapshots stay on this page until it is closed.

Actual quantities can change with field measurements, soft base, grade correction, compaction or settling, moisture, existing material, cutting waste, drainage failures, supplier packaging, and unsuitable soil. This is not a quote or engineered design.

Source & limits

Last reviewed
September 2, 2026
What this can tell you
Geometric area and volume from the measurements you enter, plus transparent editable allowance, loose-volume, density, bag, bale, and pallet assumptions.
What this cannot tell you
Required structural depth, subgrade condition, compaction specification, delivery access, exact density, or the final amount a supplier or contractor will require.