The approximately 500-square-foot gravel parking area was completed on September 11, 2026. The work covered the ground preparation and gravel pad; carport installation was a separate next stage.

See the project photographs
Wide early-work view of the staked lawn area selected for the new 20-by-25-foot carport pad.

Wide early-work view of the staked lawn area selected for the new 20-by-25-foot carport pad.

Wide early-work view of the staked lawn area selected for the new 20-by-25-foot carport pad.

The property

A homeowner needed an approximately 20-by-25-foot gravel parking area beside an existing driveway for a planned carport.

The work

Moss & Sons prepared the ground with a mini excavator, cleaned the edges by hand, compacted the ground, and installed 10 tons of crusher run within the agreed footprint.

The result

The approximately 500-square-foot gravel parking area was completed on September 11, 2026. The work covered the ground preparation and gravel pad; carport installation was a separate next stage.

RECORDED SCOPE · COMPLETED SEPTEMBER 11, 2026

500 square feet. Ten tons. A $2,400 completed project.

The job record identifies a 20 × 25-foot parking area in Carrollton and 10 tons of crusher run. The completed project price was $2,400. That price belongs to this specific scope and date; it is not a current offer for every 500-square-foot pad.

The dimensions and scope in the job record
Footprint20 × 25 feet = 500 square feet
Material10 tons of crusher run
Equipment recordedMini excavator, NorthStar plate compactor and hand tools
Job-day time recordedApproximately 9 hours, with quoting time recorded separately
Completed project price$2,400 for the recorded work

The work sequence

  1. Lay out the footprint. Establish the 20 × 25-foot area and its connection to the existing driveway.
  2. Prepare the ground. Remove sod and unsuitable surface material within the agreed work area.
  3. Shape the subgrade. Prepare the exposed ground and work the edges by hand where needed.
  4. Compact the exposed ground. The job record includes plate-compactor work before stone placement.
  5. Place the crusher run. Distribute the recorded 10 tons across the prepared area.
  6. Shape and compact the surface. Finish the parking area and the driveway connection.

The record documents the work and the finished appearance. It does not include a laboratory soil classification, a field density test, a measured uniform compacted thickness or a documented later storm assessment.

Why ten tons does not specify the next pad

Crusher run is a graded aggregate product containing a range of particle sizes and fines. Its loose volume and compacted condition depend on the supplied material and placement. Confirm the product and conversion with the supplier.

For illustration only, using a supplier conversion of 1.5 US short tons per loose cubic yard would convert 10 tons to about 6.67 cubic yards. Spread evenly over 500 square feet, that is about 4.32 inches of loose material. That calculation is not a measurement of this project's finished thickness and is not a design recommendation.

A new property needs its own review of subgrade, water, traffic, finished elevations, access and material section. Red clay exposed at one part of a site does not establish the strength or condition beneath the whole pad.

Use the price to ask better questions

The historical total divided by the footprint is $4.80 per square foot. It includes the recorded preparation and placement scope. It cannot tell you a separate labor rate, business profit or the price for another site.

  • Does the new quote include removal of existing sod or unsuitable material?
  • Who pays for material, delivery and any additional hauling?
  • How are access, soft ground and the driveway transition addressed?
  • What finished condition and closeout records are included?

Read how equipment setup and the whole project price relate.

Measure your own area and compare entered supplier quotes.

THE WORK IN PHOTOGRAPHS

See the condition and the preparation.

Have similar work? Text Daniel your town and a few photos, or call to discuss it. You can attach photos in your messaging app.

PLANNING SIMILAR WORK

Agree the footprint and the next use first.

This project began with a defined parking-area footprint and a plan for a later carport. Preparing the ground, dressing the edges, compacting, and placing the crusher run were the agreed work.

A gravel pad and a finished carport are separate stages. For your property, discuss the intended use, access for equipment and materials, and any requirements from the installer before agreeing the ground work.

Questions about this kind of project

Does a parking pad quote include the carport?

Only if expressly included. This job covered the ground preparation and gravel area; carport installation was separate.

Would my parking area need 10 tons too?

Not necessarily. Area, existing ground, preparation and the agreed finished depth affect the quantity. Daniel reviews your property before confirming materials or price.